SEA066 Mission 16

This mission was in Skagerrak.
Start: 2022-01-15
End: 2022-01-23
Download data: https://erddap.observations.voiceoftheocean.org/erddap/tabledap/delayed_SEA066_M16.html
Comment: Altitude set to 12m the entire mission duration. Zt/zs set to 2m for most of the mission and occasioanally increased to 15m. The ADCP stopped working at C142 as well as the OCR504 (Irradiance). Glider was recovered soon after due to suspected leak. Water was found in the dry section of the glider

Please acknowledge data used in any publication with the following statement:

This study used data collected and made freely available by Voice of the Ocean Foundation (https://voiceoftheocean.org) accessed from https://erddap.observations.voiceoftheocean.org/erddap/index.html