SEA063 Mission 60

This mission was in Bornholm Basin.
Start: 2023-04-22
End: 2023-05-08
Download data: https://erddap.observations.voiceoftheocean.org/erddap/tabledap/delayed_SEA063_M60.html
Comment: Altitude set to 2m for the entire mission duration . Zt/zs set to 2m for the entire mission duration. Emergency recovery due to a broken linear actuator. The glider spent about 20h at surface while waiting for recovery. During most of this time, the payload was swithced off and no data was collected

Please acknowledge data used in any publication with the following statement:

This study used data collected and made freely available by Voice of the Ocean Foundation (https://voiceoftheocean.org) accessed from https://erddap.observations.voiceoftheocean.org/erddap/index.html




Deployment CTD cast


Recovery CTD cast