SEA063 Mission 55

This mission was in Bornholm Basin.
Start: 2023-03-01
End: 2023-03-16
Download data: https://erddap.observations.voiceoftheocean.org/erddap/tabledap/delayed_SEA063_M55.html
Comment: Altitude set to 2m for the entire mission duration. Zt/zs set to 2m for the entire mission duration. Due to iridium communication issues, the glider spend about 17h at surface drifting and after that the glider was recovered

Please acknowledge data used in any publication with the following statement:

This study used data collected and made freely available by Voice of the Ocean Foundation (https://voiceoftheocean.org) accessed from https://erddap.observations.voiceoftheocean.org/erddap/index.html