SEA061 Mission 39
This mission was in Bornholm Basin.
Start: 2021-06-11
End: 2021-07-05
Download data: https://erddap.observations.voiceoftheocean.org/erddap/tabledap/delayed_SEA061_M39.html
Comment: Altitude set to 6m for the entire mission duration. Zt/zs set to 5m for the entire mission duration. Glider left at surface with payload switched off for about 10h before recovery
Please acknowledge data used in any publication with the following statement:
This study used data collected and made freely available by Voice of the Ocean Foundation (https://voiceoftheocean.org) accessed from https://erddap.observations.voiceoftheocean.org/erddap/index.html