SEA044 Mission 86

This mission was in Skagerrak, Kattegat.
Start: 2023-09-14
End: 2023-09-26
Download data: https://erddap.observations.voiceoftheocean.org/erddap/tabledap/delayed_SEA044_M86.html
Comment: Altitude set to 2m for the entire mission duration. Zt/zs set to 2m for the entire mission duration. The glider drifted at surface for about 8h while waiting for emergency recovery as there was a leak in the external ballast bladder.

Please acknowledge data used in any publication with the following statement:

This study used data collected and made freely available by Voice of the Ocean Foundation (https://voiceoftheocean.org) accessed from https://erddap.observations.voiceoftheocean.org/erddap/index.html




Command console plots


Deployment CTD cast